{"id":8772,"date":"2020-09-08T10:01:53","date_gmt":"2020-09-08T08:01:53","guid":{"rendered":"https:\/\/aedic.eu\/?p=8772"},"modified":"2020-09-08T10:01:53","modified_gmt":"2020-09-08T08:01:53","slug":"costruzione-di-2-centrali-solari-da-25-mw-nel-nord-del-camerun","status":"publish","type":"post","link":"https:\/\/aedic.eu\/en\/invest-in-africa\/construction-of-2-25-mw-solar-power-stations-in-north-cameroon\/","title":{"rendered":"Construction starts on two 25 MW solar power plants in northern Cameroon"},"content":{"rendered":"<p><strong>Investing in energy in Africa - FCFA 14 billion allocated for the construction of two solar power plants in the far north<\/strong><\/p><div id=\"ez-toc-container\" class=\"ez-toc-v2_0_82_2 counter-hierarchy ez-toc-counter ez-toc-white ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Index<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #1e73be;color:#1e73be\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #1e73be;color:#1e73be\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/aedic.eu\/en\/invest-in-africa\/construction-of-2-25-mw-solar-power-stations-in-north-cameroon\/#Gestire_il_rischio_in_Africa_con_calma_e_professionalita\" >Managing risk in Africa calmly and professionally<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/aedic.eu\/en\/invest-in-africa\/construction-of-2-25-mw-solar-power-stations-in-north-cameroon\/#Aedic_con_i_suoi_consulenti_ha_la_possibilita_di_farvi_entrare_in_Africa_Centrale_e_prendere_posizione_dove_sorgera_la_citta_industriale_di_Kribi\" >Aedic with its consultants has the opportunity to bring you into Central Africa and take a position where the industrial city of Kribi will be built.<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/aedic.eu\/en\/invest-in-africa\/construction-of-2-25-mw-solar-power-stations-in-north-cameroon\/#Guardate_questo_video_per_comprendere_meglio_di_cosa_stiamo_parlando\" >Watch this video to better understand what we are talking about.<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/aedic.eu\/en\/invest-in-africa\/construction-of-2-25-mw-solar-power-stations-in-north-cameroon\/#che_cosa_volete_fare_ora\" >what do you want to do now?<\/a><\/li><\/ul><\/nav><\/div>\n\n<p>With a capacity of 25 MW, these two facilities, scheduled for delivery in 2020, will be built in Guider and Maroua respectively.<\/p>\n<p><strong>Energy of Cameroon (Eneo)<\/strong> and a consortium of developers consisting of Scater Solar and Izuba Energy Sphinx Energy signed a memorandum of understanding for the construction of two solar photovoltaic plants.<!--more--><\/p>\n<p><strong>With a total capacity of 25 MWp<\/strong>, the two solar power plants will be built in the locations of <strong>Guider<\/strong> (10 MWp), in the northern region and <strong>Maroua<\/strong> (15 MWp), in the region of the extreme <strong><a href=\"https:\/\/aedic.eu\/en\/boko-haram\/boko-haram-paul-biya-supports-members-of-the-vigilance-committee-against-terrorism-in-north-cameroon\/\">northern Cameroon<\/a>.<\/strong><\/p>\n<p>The investment cost of these infrastructures is estimated at EUR 22 million, equivalent to almost <strong>14 billion FCFA<\/strong>. They should provide an annual electricity of<strong> 49 GWh<\/strong>the price per kWh is considered very competitive with the market.<\/p>\n<blockquote><p>\"\" These two plants, scheduled to be commissioned in 2020, will improve the energy supply in Cameroon, mainly in the network <a href=\"https:\/\/aedic.eu\/en\/invest-in-africa\/north-cameroon-seeking-investors-for-the-development-of-rice-growing\/\">of the North<\/a>They will contribute clean energy'',<\/p><\/blockquote>\n<p>we learn. source Eneo.<\/p>\n<p>The newspaper Eco Matin stated that on 16 July 2019, <strong>\u00c9neo Cameroon<\/strong> and the Consortium signed this Memorandum of Understanding, allowing them to define the modalities of structuring <a href=\"https:\/\/aedic.eu\/en\/invest-in-africa\/pipeline-ciad-camerun-the-credibility-of-the-project-for-camerun\/\">of the Project<\/a>as well as the key stages of the development of the solar power plant 02. The signing of this Memorandum of Understanding is an important milestone that paves the way <a href=\"https:\/\/aedic.eu\/en\/economics\/the-cameroon-presents-to-the-world-bank-a-project-to-bring-electricity-to-687-localities\/\">to the finalisation of the Power Purchase Agreement<\/a> (PPA) with Eneo and early construction, environmental impact studies and the soil component. being completed at 40%.<\/p>\n<p>It was also in accordance with Act No. 2011\/022 <a href=\"https:\/\/aedic.eu\/en\/invest-in-camerun\/the-ministry-of-trade-in-cameroon-supports-aedic-association\/\">of 14 December 2011 regulating the electricity sector in Cameroon that Eneo, the national electricity operator, had selected the consortium to finance, construct, operate and sell energy produced by the Maroua and Guider solar power plants after an international tender launched on 6 October 2017 under the supervision of the Ministry<\/a> water and energy resources (mining) and <strong>the Regulatory Agency<\/strong> for the electricity sector (Arsel).<\/p>\n<p>On the other hand, the consortium of developers consisting of <strong>Scater Solar<\/strong>, Izuba Sphinx Energy does not arrive in unknown territory. According to information, they have accumulated experience in the development of solar plants, around 1000 MW of total capacity in operation and around 700 MW of additional construction and <strong>5000 MW of development<\/strong>a considerable part <a href=\"https:\/\/aedic.eu\/en\/invest-in-africa\/seventh-international-tokyo-conference-on-african-development-ticad-7-japan-sudafrica-and-african-development-bank-reveal-priorities-for-accelerating-the-transformation-trans-journey-of-the-techno\/\">of which is carried out in Africa<\/a>.<\/p>\n<p>&nbsp;<\/p>\n<h3 style=\"text-align: center;\"><span class=\"ez-toc-section\" id=\"Gestire_il_rischio_in_Africa_con_calma_e_professionalita\"><\/span><strong>Managing risk in Africa calmly and professionally<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>&nbsp;<\/p>\n<p><strong>Thanks to important bilateral recognitions and collaborations with institutions, port agencies etc,<\/strong> for your economic breakthrough in Africa, <strong>AEDIC<\/strong> offers the opportunity to enter a safe harbour, with tax benefits and tax relief for 10 years, concessions and low cost of highly educated skilled labour in <strong>central location in AFRICA.<\/strong><\/p>\n<p><strong>When you have decided to act, we provide you with all the essential risk management tools throughout the investment lifecycle.<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-10694\" src=\"https:\/\/aedic.eu\/wp-content\/uploads\/2022\/01\/central-africa-kribi-africa-centrale.jpg\" alt=\"central-africa-kribi-africa-central\" width=\"1440\" height=\"758\" title=\"\"><\/p>\n<p>&nbsp;<\/p>\n<h3 style=\"text-align: center;\"><span class=\"ez-toc-section\" id=\"Aedic_con_i_suoi_consulenti_ha_la_possibilita_di_farvi_entrare_in_Africa_Centrale_e_prendere_posizione_dove_sorgera_la_citta_industriale_di_Kribi\"><\/span>Aedic with its consultants has the opportunity to bring you into Central Africa and take a position where the industrial city of Kribi will be built.<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<h3 style=\"text-align: center;\"><span class=\"ez-toc-section\" id=\"Guardate_questo_video_per_comprendere_meglio_di_cosa_stiamo_parlando\"><\/span>Watch this video to better understand what we are talking about.<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>&nbsp;<\/p>\n<p>[su_youtube url=\"https:\/\/www.youtube.com\/watch?v=P0savsBM0CA\" title=\"investing in africa in Kribi (Cameroon)\"]<\/p>\n<p>&nbsp;<\/p>\n<h2 style=\"text-align: center;\"><span class=\"ez-toc-section\" id=\"che_cosa_volete_fare_ora\"><\/span>what do you want to do now?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>&nbsp;<\/p>\n<p><strong>if you wish to get in touch with us to develop your business opportunity in Africa, please fill in the form below and one of our consultants will contact you within 24 hours<\/strong><\/p>\n<p class=\"wpcf7-contact-form-not-found\"><strong>Error:<\/strong> Contact form not found.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Investing in Energy in Africa - FCFA 14 billion earmarked for the construction of two solar power plants in the far north With a capacity of 25 MW, these two facilities, scheduled for delivery in 2020, will be built in Guider and Maroua respectively. Energy ... <\/p>\n<p class=\"read-more-container\"><a title=\"Construction starts on two 25 MW solar power plants in northern Cameroon\" class=\"read-more button\" href=\"https:\/\/aedic.eu\/en\/invest-in-africa\/construction-of-2-25-mw-solar-power-stations-in-north-cameroon\/#more-8772\" aria-label=\"More on Construction starts on two 25 MW solar power plants in northern Cameroon\">Read more<\/a><\/p>","protected":false},"author":1,"featured_media":10283,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"iawp_total_views":28,"footnotes":""},"categories":[8],"tags":[87,103,104,154,266],"acf":[],"_links":{"self":[{"href":"https:\/\/aedic.eu\/en\/wp-json\/wp\/v2\/posts\/8772"}],"collection":[{"href":"https:\/\/aedic.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aedic.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aedic.eu\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/aedic.eu\/en\/wp-json\/wp\/v2\/comments?post=8772"}],"version-history":[{"count":0,"href":"https:\/\/aedic.eu\/en\/wp-json\/wp\/v2\/posts\/8772\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aedic.eu\/en\/wp-json\/wp\/v2\/media\/10283"}],"wp:attachment":[{"href":"https:\/\/aedic.eu\/en\/wp-json\/wp\/v2\/media?parent=8772"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aedic.eu\/en\/wp-json\/wp\/v2\/categories?post=8772"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aedic.eu\/en\/wp-json\/wp\/v2\/tags?post=8772"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}